Project case study

Bathroom Tile Renovation in Islington Village

A dated main bathroom stripped to the studs and finished with large-format porcelain floor tile, a full-height shower surround and new drywall and paint.

Bathroom Tile Renovation in Islington Village

The work

The brief

The homeowners wanted a brighter, easier-to-clean bathroom without moving the plumbing. The existing tile had loose sections and the drywall behind the tub showed signs of moisture.

The work

  • Removed the old tile, tub surround and damaged drywall
  • Installed cement board and a waterproofing membrane in the shower area
  • Laid 12×24 porcelain floor tile with a centred layout and clean edge transitions
  • Tiled the shower surround to the ceiling with a recessed niche
  • Repaired ceiling drywall, primed and painted with a bathroom-grade finish

The result

A bright, low-maintenance bathroom finished in eleven working days, with the family able to use a second washroom throughout.

Start your project

Let’s build something
that lasts.

Tell us about the work. We reply within one business day with the next step — a site visit, a remote review or a written estimate.

Project photos (optional)
    Call Request an Estimate